Last edited by Vutilar
Friday, May 8, 2020 | History

1 edition of Technical specifications, Susquehanna Steam Electric Station, Unit no. 1, docket no. 50-387 found in the catalog.

Technical specifications, Susquehanna Steam Electric Station, Unit no. 1, docket no. 50-387

Technical specifications, Susquehanna Steam Electric Station, Unit no. 1, docket no. 50-387

appendix "A" to license no. NPF-14

  • 373 Want to read
  • 2 Currently reading

Published by The Commission in Washington, D.C .
Written in English

    Subjects:
  • Nuclear fuel claddings,
  • Nuclear reactors -- Cooling,
  • Nuclear power plants -- Safety measures

  • Edition Notes

    Other titlesSusquehanna Steam Electric Station, Unit no. 1, docket no. 50-387
    Statementissued by the U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation
    ContributionsU.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
    The Physical Object
    Pagination1 v. (various pagings) :
    ID Numbers
    Open LibraryOL16809470M

    AND PROPOSED AMENDMENT NO. TO UNIT 2 LICENSE NPF LOW PRESSURE SAFETY LIMIT AND REFERENCE CHANGES PLA Docket Nos. and In accordance with the provisions of 10 CFR , PPL Susquehanna, LLC (PPL) is submitting a request for an amendment to the Technical Specifications (TS) for Susquehanna Steam Electric Station (SSES ?AccessionNumber=MLA   Technical Specifications for operation of the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, PA. The amendment is effective as of the date of issuance. The amendment modified the current Technical Specifications (TSs) for each unit to include two sections of the Improved Technical Specifications (ITS)

      International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes   united states nuclear regulatory commission. washington, d.c. ppl susquehanna, llc allegheny electric cooperative, inc. docket no. susquehanna steam electric station, unit 2 amendment to facility operatii\lg license. amendment no. renewed license no. npf ://

      ALLEGHENY ELECTRIC COOPERATIVE, INC. DOCKET NO. SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. Renewed License No. NPF 1. The Nuclear Regulatory Commission (the Commission or the NRC) having found that: A. The application for the amendment filed by Susquehanna Nuclear, LLC, nuclear regulatory commission washington, d.c. ppl susquehanna llc allegheny electric cooperative, inc. docket no. susquehanna steam electric station, unit 2 amendment to renewed facility operating license amendment no. renewed license no. npf ://?AccessionNumber=MLA


Share this book
You might also like
Diseases of the heart

Diseases of the heart

British North America at the Detroit Convention

British North America at the Detroit Convention

Him.

Him.

HSMHA Employee Health Program on Alcoholism

HSMHA Employee Health Program on Alcoholism

Thanksgiving Dinner

Thanksgiving Dinner

Double finesse

Double finesse

World of language

World of language

What do you think about God?

What do you think about God?

Swedish genealogical dictionary

Swedish genealogical dictionary

Real Questions Guys Are Asking (Real Questions)

Real Questions Guys Are Asking (Real Questions)

Charles the king

Charles the king

Travelers Bundle

Travelers Bundle

St.Augustine.

St.Augustine.

Technical specifications, Susquehanna Steam Electric Station, Unit no. 1, docket no. 50-387 Download PDF EPUB FB2

Docket No. Susquehanna Steam Electric Station, Unit 1 This license applies to the Susquehanna Steam Electric Station, Unit 1, a boiling water nuclear reactor and associated equipment (the facility), owned by the Technical Specifications and Environmental Protection Plan Technical specifications, Susquehanna Steam Electric Station, Unit no.

1, docket no. appendix "A" to license no. NPF Technical specifications, Susquehanna Steam Electric Station, Unit no.

2, docket no. appendix "A" to license no. NPF   1. FACILITY NAME 2. DOCKET NUMBER r PAGE Susquehanna Steam Electric Station, Unit 2 1 of 7 4. TITLE Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Steam Dome-Low Switches 5.

EVENT DATE 6. LER NUMBER 7. REPORT DATE 8. OTHER FACILITIES INVOLVED YEAR I SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER The U.S.

Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF and NPF, issued to PPL Susquehanna, LLC (PPL, the licensee), for operation of the Susquehanna Steam Electric Station, Unit 1 (SSES 1   DOCKET NO. SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

1 31 License No. NPF 1. The Nuclear Regulatory Commission (the Commission or the NRC) having found that: A. The application for the amendment filed by the Pennsylvania Power &   1. FACILITY NAME 2.

DOCKET NUMBER 3. PAGE Technical specifications Steam Electric Station Unit 1 1 OF4 4. TITLE Both Control Structure Chillers Inoperable 5. EVENT DATE 6. LEA NUMBER 7. REPORT DATE 8. Technical specifications FACILITIES INVOLVED YEAR I SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR NUMBER ://   ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NO. SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No 4 Renewed License No. NPF 1. The U.S. Nuclear Regulatory Commission (NRC or the Commission) has found that: A.

The application for the amendment filed by Susquehanna    and 50–, Susquehanna Steam Electric Station, Units 1 and 2, Luzerne County, Pennsylvania Date of application for amendments: Aug The NRC has prepared a Draft Environmental Assessment as its evaluation of a request by PPL Susquehanna, LLC for a license amendment to increase the maximum thermal power at Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2), from 3, megawatts-thermal (MWt) to 3, MWt at each ://   License No.

NPF and Amendment No. to Facility Operating License No. NPF for the Susquehanna Steam Electric Station, Units 1 and 2.

This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated April 4,as   NPF for the Susquehanna Steam Electric Station, Units 1 and 2. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated Jas supplemented by letter dated July 2, Therefore, the Commission, hereby grants PPL Susquehanna, LLC an exemption from the requirements of 10 CFR p Appendix E, Section to conduct the onsite portion of the biennial EP exercise required forpermitting that part of the exercise be conducted by Febru for the Susquehanna Steam Electric Station, Units 1   Septem Docket No.

Harold W. Keiser Vice President Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania Dear Mr. Keiser: SUBJECT: CONFIRMATION OF CHANGE TO TECHNICAL SPECIFICATIONS RE: SUSQUEHANNA STEAM ELECTRIC STATION, UNIT I Amendment No.

to the FOL, issued on Maauthorized a power uprate for Unit 1 to 3, MWt. SSES Unit 2 was granted conditional authorization for power production by its FOL issued on Ma Full power operation of Unit 2 at 3, MWt core power was authorized by Amendment No.

1 to the FOL, issued on J   Matter of the PPL Susquehanna LLC, (Susquehanna Steam Electric Station, Units 1 and 2), Docket Nos. and OLA, ASLBP No. BD01, July 10 Judge G. Paul Bollwerk, III, Chairman. The transcript of the J telephone prehearing conference can be found in the NRC's ADAMS document access system under Accession Petition_Request for Hearing (EPU).pdf.

SUSQUEHANNA STEAM ELECTRIC STATION (SSES), UNITS 1 AND 2 (TAC NOS. MA AND MA) Dear Mr. Byram: Enclosed is a copy of the subject notice for your information.

This notice relates to your application dated Januwhich would change the SSES Technical Specifications facility staff ?doi=&rep=rep1&type=pdf. SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. AND INTRODUCTION By letter dated Febru (Reference 1), PP&L, Inc.

(the licensee before July 1, ), proposed changes to the Technical Specifications (TSs) for the Susquehanna Steam Electric Station (SSES), Units 1 and ?doi=&rep=rep1&type=pdf.

Panel, Initial Prehearing Conference In the Matter of the PPL Susquehanna LLC, (Susquehanna Steam Electric Station, Units 1 and 2), Docket Nos. and OLA, ASLBP No.

BD01, July 10 Judge G. Paul Bolwerk, III, Chairman. 5 of Intent Re- EPUL (Epstein).pdf. Docket Numbers: and License Numbers: NPF and NPF Report Numbers: / and / Enterprise Identifier: I Licensee: Susquehanna Nuclear, LLC (Susquehanna) Facility: Susquehanna Steam Electric Station, Units 1 and 2 Location: Berwick.

License No. NPF for the Susquehanna Steam Electric Station (SSES), Units 1 and 2. These amendments consist of changes to the Technical Specifications (TSs) in response to your application dated April 8, The amendments revised and added a new Condition C to TS"RCS [Reactor Coolant  united states nuclear regulatory commission washington, d.c.

susquehanna nuclear, llc allegheny electric cooperative, inc. docket no. susquehanna steam electric station, unit 1 amendment to renewed facility operating license amendment no.

renewed license no. npf ://No significant hazards consideration comments received: No. PPL Susquehanna, LLC, Docket No.Susquehanna Steam Electric Station, Unit 1 (SSES 1), Luzerne County, Pennsylvania. Date of application for amendment: December 1,as supplemented on Febru